Integration Matrix
Trigger → interface → receiving system → expected response → acceptance criteria.
- Multi-response integrations
- Source drawings / sequence references
- Status and coverage filters
Model the interconnections. Generate the procedures. Run integrated tests. Capture photos and video. Create deficiencies directly from failed responses. Retest without losing history. Generate the final technical report. Then keep the building record alive for periodic testing and modifications.
The active CAN/ULC-1001-2026A Edition 2 scope covers integrated-testing qualifications, process, requirements, documentation, periodic integrated testing, retro-integrated testing and testing for modifications. SafeVerify’s data model is built around that lifecycle rather than around generic checklists.
BUILDING ├─ SYSTEMS │ ├─ Fire Alarm │ ├─ BAS / Controls │ ├─ HVAC │ ├─ Smoke Control │ ├─ Elevator │ └─ Emergency Power │ └─ INTEGRATION INT-041 ├─ Initiating event ├─ Originating system ├─ Interface path ├─ Receiving system(s) ├─ Expected response(s) ├─ Acceptance criteria ├─ Source drawing / sequence ├─ Test procedure ├─ Evidence set ├─ Failed-response deficiencies ├─ Retest lineage └─ Final report record
Trigger → interface → receiving system → expected response → acceptance criteria.
Visualize live system relationships across fire alarm, BAS, HVAC, smoke control, elevators and doors.
Start with original editable S1001 workflows instead of a blank spreadsheet.
A field interface simple enough for trades and detailed enough for the ITC.
One click from failed response to issue, correction and retest history.
Upload a floor plan, place test/device pins and preserve spatial context.
Keep photos and videos tied to the exact project, test and step.
Know which disciplines are ready before test day and what may block the plan.
Generate the closeout document from live project data instead of rebuilding it.
Search a changed asset/system and identify stored integrations and tests that may be affected.
Carry project history into future periodic testing and modification work.
Structure the product so firm-wide templates, SSO, audit logs and Canadian hosting remain possible.
CxAlloy currently offers asset tracking, dynamic checklists, customizable test sheets/templates, issue tracking, automated reports, file storage, offline mobile and photos. SafeVerify should meet that usability bar while making integrated-system relationships the center of the product.
| Capability | Modern Cx benchmark | SafeVerify 1001 target |
|---|---|---|
| Assets / equipment | Core capability | Systems + devices directly linked to integrations |
| Tests / templates | Core capability | Procedures generated from integration objects |
| Issue tracking | Core capability | Failed-response deficiencies with retest lineage |
| Offline field work | CxAlloy supports offline mobile | Offline-first guided integrated testing target |
| Photos / files | Core capability | Evidence tied to exact test step / integration |
| Automated reports | Core capability | Purpose-built integrated testing report assembly |
| Cause-and-effect | Typically indirect | First-class data model + visual graph |
| Periodic / retro / modification lifecycle | Generic project workflows | Dedicated building-history workflows |
Owner, project type, ITC, dates and building identity.
Systems, devices, equipment, trades and locations.
Triggers, interfaces, responses, sources and criteria.
Turn accepted integrations into executable procedures.
Field execution, evidence and live outcome capture.
Preserve failure lineage and record each retest.
Generate closeout and keep the building record alive.
The prototype below is not a dead landing page. Accounts, projects, integrations, test results, deficiencies, readiness and report data are saved locally in your browser. Evidence files use IndexedDB so small photos/videos can persist locally as well.
Browser-local MVP only. Production SaaS would use cloud authentication, database, multi-user permissions and object storage.
This MVP stores account/project data in localStorage on this browser. Do not use a real password.
Live view of the selected integrated-testing project.
Initial, periodic, retro-integrated and modification testing projects.
Register participating systems, devices, equipment, locations and responsible trades.
The technical center of SafeVerify: event → interface → receiving system → response → criteria.
Interactive visualization generated from the active integration matrix.
Original, editable starters for common integrated-system relationships and procedures.
Generated from the matrix or created manually.
Step-by-step execution with linked evidence and automatic deficiency creation.
Track pre-test readiness by discipline and expose potential blockers.
Every failed response preserves the original condition, correction and subsequent retest history.
Photos and videos stored locally in IndexedDB and linked to the selected project/test.
Upload an image drawing, then click anywhere to place persistent device/test pins.
Search a changed system/asset and surface potentially affected integrations and test procedures.
Retain initial, periodic and modification cycles under a shared building identity.
Generated from the live project record.